Manor Park River Engineering Works, Glossop
Client: High Peak Borough Council
Consultant: White, Young, Green
Value: £154,000
To view a larger version of a photograph, simply click on it. The photograph will open in a new browser window.
The Shelf Brook running through Manor Park feeds directly off the Pennines to the east of Glossop. Our client is in the process of reinstating and repairing the Edwardian river walls and weirs as well as stabilizing the bed of the brook.
Retaining wall under construction with flow
control measures in place
The completed retaining wall
The Shelf Brook after heavy rain upstream in The
Pennines
Brook channelled to allow wall repairs
Re-profiling the bank of the brook using coir logs
Re-profiling the bank of the brook using
coir logs
Wall replacement with the brook channelled
The completed wall
Stabilizing the bed of the brook whilst over pumping
water from the channel
Stabilizing the bed of the brook whilst over pumping
water from the channel
The weir
Pitching to the weir
Upstream wall replacement under flow control
Keeping the users of Manor Park up to date with our
operations