Manor Park River Engineering Works, Glossop
Client: High Peak Borough Council
Consultant: White, Young, Green
Value: £154,000
To view a larger version of a photograph, simply click on it. The photograph will open in a new browser window.
The Shelf Brook running through Manor Park feeds directly off the Pennines to the east of Glossop. Our client is in the process of reinstating and repairing the Edwardian river walls and weirs as well as stabilizing the bed of the brook.
 |
 |
| Retaining wall under construction with flow control measures in place |
The completed retaining wall |
 |
 |
| The Shelf Brook after heavy rain upstream in The Pennines |
Brook channelled to allow wall repairs |
 |
 |
| Re-profiling the bank of the brook using coir logs |
Re-profiling the bank of the brook using coir logs |
 |
 |
| Wall replacement with the brook channelled |
The completed wall |
 |
 |
| Stabilizing the bed of the brook whilst over pumping water from the channel |
Stabilizing the bed of the brook whilst over pumping water from the channel |
 |
 |
| The weir |
Pitching to the weir |
 |
 |
| Upstream wall replacement under flow control |
Keeping the users of Manor Park up to date with our operations |
|